North Cyprus News | Online News for North Cyprus

New terminal for Ercan airport ready by 2018

New terminal for Ercan airport ready by 2018

September 23
10:08 2016

Construction of the new terminal for Ercan airport is continuing and is expected to be ready in 2018.

The renovated airport will cover an area of 170,000 square metres together with 128,000 square metres of covered parking space and will have a 530-metre tunnel with three lanes in both directions. The extended runway will be able to cope with the largest commercial aircraft.

Ercan’s new terminal will be able to serve up to 5 million people in the first phase and 7-8 million people later.

Minister of Public Works and Transportation Kemal Durust (pictured right) inspected the works at Ercan and stated that this will be the TRNC’s largest investment. “Our aim is to open the airport in 2018”, he said.

Halkin Sesi

 

Local Weather

Kyrenia, Cyprus
15°
16°
Tue
13°
Wed
12°
Thu
12°
Fri
Weather from OpenWeatherMap

Lira Exchange Rates

USD
USD
3.8167
EUR
EUR
4.6731
GBP
GBP
5.3113

Upcoming Events

  1. Whirling Dervish

    January 22
  2. North Nicosia Walking Tour

    January 22
  3. Whirling Dervish

    January 23
  4. Whirling Dervish

    January 24